The crews worked 24-7, only stopping for holidays and severe weather. The bridge was anticipated to open this Christmas, but due to new construction technology and the non-stop work, the bridge opened today at 5am.
There are videos and photos at this link:
http://www.myfoxtwincities.com/myfox...Y&pageId=1.1.1